人妻少妇精品无码专区-久久亚洲精品无码播放-国内精品久久久久久久小说-99视频精品全部免费 在线

AC source power & DC source power manufacturing factory

Test Application on AC Contactor

AC contactor is a switching device which uses electromagnetic force and spring elastic force to connect and break contacts to control the on-off of load circuit. It is suitable for frequent operation and long-distance control. It is an important component of automatic control circuit system. With the growth of national economic demand and power industry, the demand for AC contactors continues to grow, and competition is increasingly fierce. In order to ensure product quality, the testing of AC contactors is particularly important.

Following will take AC contactor test requirements as an example to introduce AC contactor test scheme in detail.
Before starting the test, we first understand its working principle: when the AC contactor's attraction coil is electrified, the static iron core produces electromagnetic attraction, the armature is absorbed, and the connecting rod connected with the armature drives the contact action, so that the normally closed contacts are disconnected, and the often open contacts are closed, both of them are linked, and the contactor is in the electrified state; When the coil is cut off, the electromagnetic suction disappears, the armature is released under the action of spring, which makes the normally closed contacts closed, the often open contacts disconnected, and the contactor is in a state of power loss.

The client test requirements are as follows: 

1. ON/OFF test: Set ON/OFF AC voltage (rated voltage), starting angle 90 degrees, termination angle 0 degrees, ON/OFF twice, and finally OFF.            
2. Characteristic test: setting voltage (rated voltage), starting angle 30 and termination angle 90 and output ON. Read peak current immediately, delay 500 ms, read and maintain current, maintain power consumption, and finally OFF.           
3. Suction voltage test: first set the suction start voltage (20% of rated voltage), output to ON, then every 200 ms, the voltage rises in accordance with 5V step up to suction, read the suction voltage, and finally output OFF.            
4. Release Voltage Test: First set the release starting voltage (rated voltage), output to ON, set the release voltage (rated voltage 68%) and then every 200 ms, the voltage descends according to 5V step to read the release voltage after release; finally output the OFF.

Among them:
Test requirements 1,2, can be achieved by the panel setting function of ADMIRE POWER standard AC power supply APA1000 series . This function can be set voltage, frequency, starting phase angle and terminating phase angle. The range of setting phase angle is 0-360.

Test requirements 3,4, can be achieved through the ADMIRE POWER standard AC power APA1000 series power supply internal test group, the function can be set up 35 test points to set the starting voltage value, termination voltage value, step voltage value, start frequency, termination frequency and single step time, so that the power supply voltage and time Frequency varies in a step-by-step fashion. If the 35 test points are not enough, the intelligent AC power supply APA2000 series (touch screen display) can provide five test groups, each of which has 35 test points, and each test point can set different voltage, frequency and time.

Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
主站蜘蛛池模板: 激情偷乱人伦小说视频在线| 熟女老女人的网站| 亚洲av福利天堂一区二区三 | 欧美日韩亚洲中文字幕二区| 久久99国产精一区二区三区| 无码人妻精品一区二区三区不卡| 国产亚洲精品精品精品| 免费超爽大片黄| 亚洲综合色成在线播放 | 亚洲欧美日韩综合一区| 中文人妻无码一区二区三区| 国产乱码卡一卡2卡三卡四| 精品乱码久久久久久久| 狠狠综合久久久久尤物丿| 藏春阁福利视频| 无码人妻一区二区三区在线视频 | 日本大肚子孕妇交xxx| 色翁荡息又大又硬又粗视频 | 不卡av电影在线| 3d动漫精品啪啪一区二区下载| 亚洲av无一区二区三区| 99国产精品永久免费视频| 亚洲第一区欧美国产综合| 国产乱人激情h在线观看| 国产一区日韩二区欧美三区| 国产mv在线天堂mv免费观看| 国产精品国产三级国产普通话| 国产麻豆精品精东影业av网站| 国产国产精品人在线视| 国产日韩欧美| 五十路丰满中年熟女中出| 亚洲av无码av在线播放| 亚洲精品无码久久毛片| 色欲av永久无码精品无码| 日本动漫瀑乳h动漫啪啪免费| 亚洲狠狠婷婷综合久久久久| 久久9精品区-无套内射无码| 纯爱无遮挡h肉动漫在线播放| 老汉色老汉首页a亚洲| 亚洲av永久无码精品国产精品| 国产亚洲精品aaaa片小说|